Louisville KY building permits and codes
Oldham County permits

Building permits in Oldham County.

Wilson Way pulls all permits and schedules all inspections. Here's what to expect in Oldham County.

Oldham County Planning and Development in La Grange reviews residential permits on paper and takes 2 to 4 weeks to issue them. Permit fees run 0.5% to 0.9% of project value, and most projects take 3 to 5 inspections. The codes are IRC 2018 with the Kentucky Residential Code, enforced the same way as anywhere else in the state.

Oldham is a house-heavy county with plenty of older and larger homes, so review runs deeper than a straightforward addition elsewhere. Custom work, additions landing on existing slabs, and anything touching the structure of an older house draw more questions. Properties near Floyds Fork or Harrods Creek also need floodplain review.

We work in Oldham County weekly, and that matters more than it sounds. A reviewer who has seen our submittals before reads them faster, and a question gets answered with a phone call instead of a letter. We deliver paper applications to 100 W. Jefferson Street and check in during the 8am to 4:30pm window.

The process

From first walk to final certificate.

  1. Site walk and scope check

    You and we, on site

    We measure and confirm whether the lot sits near a floodplain area.

  2. Drawings and engineered plans

    Our design-build team, plus an engineer when needed

    Structural, electrical, plumbing, and HVAC work goes to the county as one package.

  3. Paper application delivered

    We

    Submitted in person to 100 W. Jefferson Street in La Grange during office hours.

  4. Floodplain and zoning review

    Oldham County reviewers

    Near Floyds Fork or Harrods Creek this runs alongside plan review and can affect where work sits.

  5. Plan review and corrections

    Oldham County plan reviewer

    Checked against IRC 2018 and the Kentucky Residential Code. We resubmit corrections.

  6. Permit issuance and fee payment

    Oldham County

    Fees of 0.5% to 0.9% of project value are due before the permit is active, inside your contract.

  7. Construction, inspections, and certificate

    Our crew on site and our project manager scheduling

    We attend each inspection through the final, then file the certificate of occupancy.

Inspection points

What gets checked, and when.

Footing

Before concrete is poured

Excavation depth, footing dimensions, rebar placement and cover, drainage slope.

Framing

After framing and roof sheathing, before drywall

Nailing patterns, headers, hold downs, match to approved drawings.

Rough-in

After electrical, plumbing, and HVAC rough-in, before insulation

Wiring, box fill, pipe slope, venting, drain sizing.

Insulation

After insulation and vapor barrier, before drywall

Rvalues in walls, attic, and floor, plus air sealing.

Final

After all trades finish and the site is cleaned

Fixtures, devices, guardrails, egress windows, alarms, remaining code items.

What gets rejected

The six things that fail inspection here.

  • An addition tied into an existing structure without showing that connection on the drawings. The reviewer asks for engineered detail and the permit waits.
  • Work placed in a floodplain area without the required review. It can move the footprint and change the design, so we check before drawings.
  • Footing poured before the inspection. Fastest way to fail and most expensive to correct, because the concrete comes out.
  • Rough-in covered before it was inspected, which means opening finished walls later to show work nobody has seen.
  • Stair guardrails and handrail returns missing where a ceiling height changed. We check while framing is still open.
  • Moving a wall or window after the permit issued. The county can require an amended permit and pull the job back to review.
Your side

What Oldham County asks the homeowner to do.

  • Tell us if the property sits near a creek or floodplain, since that review can change the design.
  • Decide the layout before drawings start, since fixture locations drive the plumbing rough-in.
  • Tell us what the existing house does not do well: cold rooms, poor light, a floor that moves.
  • Provide any survey or recorded plat we request when the work touches a setback or lot line.
  • Keep the yard and driveway workable on inspection days so the inspector can reach the work.
  • Give the review clock 2 to 4 weeks and do not start construction before the permit issues.
  • Pay on the agreed schedule and read what you sign.
Unpermitted work

Old houses carry old additions, and inspectors open them up.

In a county full of homes built in stages, unpermitted work is common and the county has good reason to look closely. When the inspector cannot see what is inside a wall, the wall comes off. On a bathroom that means the surround, on a kitchen it means cabinets and drywall, and you pay for both.

Then it becomes a sale problem. A buyer and a lender will both ask for a certificate of occupancy. A house without one stalls the closing or closes with a hold on your proceeds. If you have inherited a house with work of unknown history, call us before you buy or sell it.

Questions

Permit questions we get asked.

Why does Oldham County take longer to review than Bullitt County?

The construction here is heavier and more custom, so the reviewer has more to check. Additions on existing slabs, work tied into older structures, and larger custom homes all draw more comments. Review runs 2 to 4 weeks against 1 to 3 in Bullitt County. Submitting one complete set of drawings the first time keeps it short.

What does floodplain review mean for my project?

Properties near Floyds Fork or Harrods Creek need floodplain review from the county. That can affect where a foundation sits, how low you can build, and what finishes belong in a below-grade space. We check the parcel early so a design does not have to be redrawn after the reviewer tells us where water goes.

Do you handle permits for Oldham County?

We work in Oldham County weekly and we pull and submit the permits ourselves. Applications go in on paper to 100 W. Jefferson Street in La Grange, Monday through Friday, 8am to 4:30pm. You will not be chasing the county or standing in line. We schedule every inspection and file the certificate of occupancy.

What do permits cost in Oldham County?

Permit fees run 0.5% to 0.9% of project value, in the middle of our range across the counties we work. They are included in the contract price we give you. If a contractor hands you a fee invoice and asks you to take it to the counter, you become responsible for submittal, scheduling, and re-inspections.

Permit timeline
2-4 weeks for residential projects
Permit cost
0.5%-0.9% of project value
Inspections per project
3-5 typical
Online application?
Paper only
Permitting office

Oldham County Planning & Development

Address: 100 W. Jefferson Street, La Grange, KY 40031

Phone: (502) 222-1476

Hours: Mon-Fri 8am-4:30pm

Applications: Paper applications only

What Wilson Way handles

You don't lift a finger.

As part of every contract, Wilson Way:

  • Pulls all permits required for your project
  • Submits engineered plans when required
  • Schedules all inspections and is on-site for each
  • Coordinates with inspectors to resolve any issues
  • Files the final certificate of occupancy when work is complete
  • Includes permit fees in your contract, no surprise add-ons
Oldham County-specific notes

What makes Oldham County different.

  • Higher-end market = more complex plan review
  • Same IRC 2018 + Kentucky Residential Code
  • Floodplain review required for properties near Floyds Fork or Harrods Creek
  • Wilson Way works in Oldham County weekly
What to expect

The inspection timeline.

For a typical Oldham County residential project, here is the inspection sequence:

  1. Footing inspection, before we pour concrete. Verifies depth + rebar placement.
  2. Framing inspection, after framing is up, before drywall. Verifies structural integrity.
  3. Rough-in inspections, electrical, plumbing, mechanical (HVAC). All three typically same week.
  4. Insulation inspection, after insulation is installed, before drywall.
  5. Final inspection, after all work is complete. Issues Certificate of Occupancy (CO).

Wilson Way's lead carpenter is on-site for every inspection. Average inspection: 30 minutes. No re-inspections on our projects.