Small scope
What's included
- Single-trade repairs + finishes
- Permit handling where required
- Cleanup and haul-off
- One-year workmanship warranty
Not included
- Structural work
- Plumbing relocation
- Full interior finish
Real 2024-2025 Louisville pricing, not national averages. 3 tiers, broken out.
Everything else adjusts the number, but scope sets it. We quote from your project, never from a website range.
Pre-1980 Louisville homes often carry knob-and-tube wiring, cast iron drains, or asbestos that must be handled.
Tight lots, no side-yard access, and established landscaping all affect staging, material delivery and labor time.
A full gut remodel pulls 5-10 permits and 15-25 inspections. Wilson Way handles all of them.
The same footprint with mid-range versus premium finishes can differ by three to five times the base cost.
General contractor cost in Louisville runs $3K to $15K for a small scope such as a permit item or a single trade repair, $15K to $85K for a mid-range remodel, and $85K to $400K+ for a whole-home or new construction build. We quote from your project instead of a website range, and every proposal we issue is fixed price with a milestone draw schedule.
Scope sets the number and everything else adjusts it. A pre-1980 Louisville home can add 10% to 30% for knob-and-tube wiring, cast iron drains, or asbestos handling. A full gut remodel pulls 5 to 10 permits and 15 to 25 inspections, which runs 1% to 2% of project value. Finish level is the widest swing of all: the same footprint can land three to five times apart between mid-range and premium materials.
What a lowball bid leaves out is usually the same list every time: permits, inspections, project management, subcontractor coordination, cleanup, and the warranty. Those are the line items that look small on a spreadsheet and decide whether the project gets inspected, documented, and signed off for resale. We build them into the proposal so the number you compare is the number you actually pay.
Full interior scope in Louisville. Pre-1980 homes often add 10% to 30% for wiring, drain, or asbestos remediation.
Land cost is separate. A larger or more complex footprint pushes the per-square-foot number up.
Better materials and more complex design. The same footprint can spread three to five times from mid-range to premium.
Single trade work with permit handling, cleanup, and a 1-year workmanship warranty. No square foot math applies.
A full gut pulls 5 to 10 permits and 15 to 25 inspections. We handle all of them, and they sit inside our proposal.
Knob-and-tube wiring, cast iron drains, and asbestos have to be handled, not worked around.
We walk the space, take photos, listen to what the project needs to do, and issue a fixed price proposal with a milestone draw schedule.
Design and scope development, engineered plans where the job needs them, and the permit set get filed and approved.
Demo, haul-off, site protection, and any excavation or grading happen before anything gets framed.
Framing, plumbing, electrical, and HVAC rough-ins, insulation, and drywall follow each other, with inspections between the trades.
Cabinetry, tile, flooring, paint, fixtures, and trim get installed, then we walk the punch list and close the job.
A remodel returns on two channels. One is the equity you put into a house you plan to keep. The other is resale. Updating a kitchen or bath that buyers already rank as outdated tends to hold value better than leaving it alone, because the replacement cost of that labor and those materials keeps climbing every year.
The second channel is avoidance. A foundation that stays wet, a roof that leaks, and wiring that cannot carry modern loads all get more expensive the longer they sit. Money spent on the right repairs before they become failures is the least speculative return in a project. We will tell you in writing which items are necessary and which are optional. In older Louisville housing that means you also protect against the inspection finding that stops a sale later, which is an expensive problem to solve at the closing table.
Payback depends on scope, the resale market, and how long you plan to stay. A structural or safety correction pays back in avoided cost. A cosmetic refresh pays back at sale, and only if the market rewards it.
Some parts of a project are genuinely owner work. Painting, some demolition, landscaping, a fence, a simple cabinet install, and even a good chunk of site cleanup can be done by a competent homeowner with a Saturday and a set of tools. We do not think that work is worth a markup.
The trade work is where the risk and the money both sit. Permits, inspections, rough-in plumbing, electrical, HVAC, structural work, and the coordination between them require someone who has done them before and who carries the responsibility when they fail. That is not a knock on homeowners. It is the part where a saved dollar turns into a five figure redo. The work is also licensed and insured for a reason, and that liability transfer is worth something on a project where a failed rough-in damages a ceiling below it.
Compare line items, not totals. Two bids at the same number can carry very different scopes, and the lower total may simply be missing permits, cleanup, or a warranty. Ask both for the same list: permits, inspections, project management, cleanup, and warranty. Then compare scope line by line.
Our proposals are fixed price, and project management is included rather than billed as a percentage on top. When a contractor takes a percentage of your project cost, your scope change becomes their fee increase. Ask whether the number you are given is the number you will pay.
We price change orders as written line items with labor and material separated, and we get your approval before the work starts. Change orders should be rare on a well scoped project. A contractor who cannot describe how one gets priced is the one whose total keeps drifting.
For a single trade, yes. A plumber can quote a faucet replacement cheaper than a general contractor will. For anything that needs multiple trades, permits, inspections, and a sequence, direct hiring makes you the project manager and the general contractor, without the license or the warranty behind it.
The contractor should handle them. Permits require the license holder to pull them and schedule inspections, and a homeowner pulling their own permit on a GC contract puts the inspection trail outside the contract. Our proposals include permits and inspections so the work is documented for resale.
We do not publish a deposit percentage, because the schedule drives it. What matters is structure: draws tied to completed and inspected milestones instead of calendar dates, and no payment for work that has not started. Ask for the draw schedule to come with the proposal.
Our cost calculator uses Louisville-specific data. Walk through 4 questions and get a range based on real Louisville project bids from 2024-2025.
Try the Cost CalculatorOr skip the calculator and schedule a free 30-minute in-home consultation, we will walk your actual space and give you a real range within a week.
Free 30-minute consultation. Real Louisville pricing, real timeline.
Schedule a Free Consult