Bathroom projects in Louisville + Southern Indiana
Browse 5 of our recent bathroom projects from across Louisville, St. Matthews, Prospect, and Southern Indiana. Each project was led start-to-finish by our in-house team, no subs to chase, no scope drift. Have a bathroom project in mind? Get a free consultation and we'll walk your space, give you a real range, and explain how we'd approach it.
We build bathrooms in Louisville, St. Matthews, Brownsboro, Taylorsville, Lake Forest, and Southern Indiana. A mid-range primary bathroom remodel in Louisville lands between $22,000 and $55,000. A powder room runs $8K to $15K, a hall bath $18K to $35K, a primary bath $35K to $65K, a luxury suite $65K to $120K and up.
Four items carry most of that range. Tile runs $2K to $15K, the shower enclosure $2K to $10K, plumbing fixtures $2K to $15K, and a layout change $4K to $10K. Waterproofing with a Schluter Kerdi system adds $1.5K to $4K, and it is the line most often left out of a low quote.
We price the wet room before the finishes. On a recent St. Matthews primary bath and a Taylorsville ranch master bath, the number did not move after demolition because we had already priced the shower pan, the fan, and the fixture list beforehand.
What moves the number
The shower is the most expensive square foot in the house. The enclosure runs $2K to $10K, and frameless glass alone runs $2K to $6K for a standard size or $6K to $10K for steam-rated glass. Tile runs $2K to $15K, and a mosaic or book-matched slab adds $5K to $15K.
Fixtures set the second tier. A faucet and shower head run $200 to $3,000, a tub $800 to $8,000, a toilet $300 to $3,000, and a heated floor adds $800 to $1,500. Moving a toilet or tub adds $4K to $10K on top of everything else you picked.
How the work moves
A bathroom runs about four weeks on site. Design, permits, and demolition take a week, rough plumbing and electrical another week, waterproofing and tile one to two weeks, and fixtures, trim, paint, and cleanup the final week. We keep one crew sequence so the room is never idle.
We pull the permit through the Louisville Metro Citizen Access Portal and schedule the inspections, including the rough-in inspection that has to happen before any tile goes up. Rough-in covered early means opening a finished wall later, so we leave it open until it passes.
What we check before we tile
We inspect the subfloor after demolition and photograph what we find. An old toilet often sits on a rotted section of subfloor, and a shower pan has to be sloped to the drain with a membrane behind it. We add $1.5K to $4K for Schluter Kerdi waterproofing, and we never tile over greenboard.
We size the exhaust fan to the room at 80 to 130 CFM and vent it outside, and we put GFCI protection on every outlet. Louisville code requires a permit for any plumbing relocation, and we pull it. Unpermitted work follows the house to the next sale.
Where we build bathrooms
Our recent bathroom work includes a St. Matthews primary bath, a St. Matthews powder room refresh, a Taylorsville ranch master bath, a Lake Forest primary bath refresh, and a Brownsboro master bath remodel. Each one started with the same wet room detail and the same permit path.
We also work in Middletown, Floyds Knobs, Corydon, and Southern Indiana towns like Jeffersonville, New Albany, and Clarksville. Same draw schedule, same inspection trail, and the same fixed price we signed before the first shovel went into the ground on the job site.
Bathroom questions we get asked.
How much does a bathroom remodel cost in Louisville?
A mid-range primary bathroom remodel in Louisville lands between $22,000 and $55,000. A powder room runs $8K to $15K, a hall bath $18K to $35K, a primary bath $35K to $65K, and a luxury primary suite $65K to $120K and up. Tile, the shower, and fixtures move it.
What drives the price on a Louisville bathroom?
Tile runs $2K to $15K, the shower enclosure $2K to $10K, plumbing fixtures $2K to $15K, and a layout change $4K to $10K. Waterproofing adds $1.5K to $4K, and permit fees land at 0.5% to 1% of project value. A quote that skips the membrane defers the repair.
How long does a bathroom remodel take?
About four weeks on site once the permit is active. Design, permits, and demolition take a week, rough plumbing and electrical a week, waterproofing and tile one to two weeks, and fixtures, trim, and paint the final week. Metro plan review runs 2 to 4 weeks before that starts.
Bathroom projects from the Wilson Way portfolio.
5 projects featured. Want one of these? Let's talk about yours.